Adding Shifts to Programs

Summary

Shifts can be connected to a programme in several ways. One method is by importing shifts and including the programme name in the import file, automatically linking the shifts to that programme. Alternatively, shifts can be added through the programme’s shifts tab by selecting and linking existing shifts, or by assigning a programme directly from the individual shift record. This flexibility allows for efficient management of shifts within specific programmes.

Transcript

  • 00:00

About how you can connect shifts to a programme. Now, there are a number of ways that you can do it. When you import shifts into the system, there is a column for programme name where you can enter the name of the programme. So if I were doing an import of a bunch of shifts now, and I put in this case Costco 2021 demonstrations in the programme name column of my import, then all those shifts that I import would automatically become part of this existing programme. A second way is I can go into a programme itself and on the shifts tab of the programme, I can go in and I can either select, create, import, whatever I needed to do to add shifts to this programme. So in this case, I’ll just hit select and it’s going to pull up all the existing shifts that are in the system, and I’m going to say, I’m going to link these three and hit select, and now those three shifts will be connected to this programme. So I can now manage those shifts inside this programme. A third way to put shifts into a programme is when you’re inside of an individual shift record. On the right panel, you’ll see an option for programme and you can create a new programme or select from the existing programmes and make that shift be part of that programme. So that’s how you can connect your shifts and put them into a programme.