What’s New in Import and How to Read Import Errors?
This guide explains the enhancements with respect to Shift Import, including how the updated import process validates your file and what to do when it identifies an issue. Validation checks have been introduced at five stages, helping you easily identify the columns, rows, and specific cells that need attention before your data is saved.
| Stage | When you see it | What happens |
|---|---|---|
| 1. Missing required columns | Right after upload | Import is blocked until the column is added |
| 2. Column pairs | Right after upload | Import is blocked until the partner column is added |
| 3. Pre-import validation | After you click Continue | Rows with problems are highlighted; you can import only the valid rows |
| 4. Import results | After the import finishes | Shows what was imported and what wasn’t, with a CSV to download |
| 5. Duplicate check | After upload and on the review screen | Files or rows already imported are flagged |
Navigate to Work → Shifts → Import to open the import page.
Before You Upload: Update Existing Records Only
One toggle above Select CSV decides whether the import can create new shifts or only change existing ones. Set it before you click Start Import, because it changes which columns are required.

The info icon next to the label explains the same: the option you pick decides which checks run during the import.
| Toggle | Mode | What it does |
|---|---|---|
| OFF (default) | Create & Update | Creates new shifts and updates existing ones |
| ON | Update Only | Updates existing shifts only; no new shifts are created |
With the toggle ON – Update Only

Only Shift Number is required. Your file only needs the Shift Number and the columns you want to change.

Stage 1: Missing Required Columns
If your file is missing a required column, the import stops and lists it under Map these columns to continue. Continue stays disabled until the column is added.
How to fix: Add the missing column to your file, click Cancel and re-upload, and upload it again.
For example, a file with separate City and State columns but no Country column:
Error ‘Country column is missing’: Add a Country column, or use one City/State/Country column instead.

Note: A column the system doesn’t recognise is not imported and shows a red header. Click the pencil icon on the header to match it to the right field, or untick it.
Stage 2: Column Pairs
Certain columns are interdependent and must be provided together. For example, if the import file includes the Talent Email column but does not include the Shift Assignment Status column, the import will not proceed until the missing column is added.
| If your file has… | It also needs… |
|---|---|
| Start Date | Start Time (or use one Start Date and Time column) |
| Start Date and Time | Total Hours or End Time |
| Talent | Shift Assignments Stage |
File with Start Date but no Start Time:

File with Talent but no Shift Assignments Stage. The column header turns amber:

How to fix: Add the dependent column and upload again, or untick the column to leave it out.
Stage 3: Pre-Import Validation
Click Continue. The system checks every row before anything is saved and sorts them into:
- Ready to import: No problems.
- With warnings: The row is imported, but the flagged part is not saved.
- Will be skipped: The row is not imported.

Scroll down to see your rows. Skipped rows have a red border, and rows with warnings have an amber border. The problematic cell is highlighted.

| Message | Result | What to do |
|---|---|---|
| We couldn’t find the city “…” | Skipped | Check the spelling, or contact [email protected] |
| Quantity must be 1 or more. | Skipped | Enter a quantity of 1 or more |
| The Start Date and Time is a required field and cannot be empty. | Skipped | Add a start date and time |
| Talent is booked on two shifts that overlap in this file. | Skipped | Change the time or Talent on one of the rows |
| No Talent found with this email. | Warning | Check the email; the shift is created without that Talent |
If the same Talent is booked on two overlapping shifts in your file, the second row is skipped:

Click Import valid rows to import the rest of the records, or Cancel and re-upload to fix your file first.
Stage 4: Import Results
When the import finishes, you’ll see Import complete with tabs.
Could not process: Every row that didn’t import, with the reason. Rows skipped in Stage 3 are marked Skipped (pre-import).

Processed: Every shift that was created or updated. Click a shift to open it.

Click Download failed and skipped rows as CSV to get every row that didn’t import, with a Reason column. Fix the rows and upload the file again.
Overtime: If assigning a Talent to a shift would exceed their daily, weekly, or holiday overtime limit, the shift will still be created, but the Talent will not be committed to it. An overtime warning message will be displayed instead.

Stage 5: Duplicate Check
We’ve added duplicate detection so the same data isn’t imported twice by mistake.
Same file uploaded again: Right after upload, you’ll see a message such as “This file was already imported on 11/24/2026 by Jonas Clieran.” This also works if the file was renamed. Click Cancel to stop, or Import Anyway to continue.

Same Data, Minor Changes: If every row matches a previous import, the file is treated as already imported, and all rows are skipped. For example, you may open a previously imported file, make minor changes (such as rearranging the rows), and upload it again. Although the file is considered new at Step 1, the duplicate check at the next step identifies the matching data and skips all rows.

Some rows already imported: Those rows are flagged with “This row was already imported on {date} by {user}.” and skipped. New rows are imported as usual.

Click Import Anyway to import the flagged rows on purpose, or Import valid rows to import only the new ones.
Note: The system checks records from the previous 30 days to identify duplicates.
Notes & Best Practices
- You must fix Stage 1 and Stage 2 problems before you can continue. Rows flagged in Stage 3 can be skipped and fixed later.
- Use the date format MM/DD/YYYY HH: MM, in 24-hour or AM/PM (e.g., 12/21/2026 2:00 PM).
- Enter City/State/Country in one column as City, State, Country (e.g., Dallas, Texas, United States of America).
- To update shifts only, turn on Update Existing Records Only and include the Shift Number.
- Fix the downloaded CSV and upload it again instead of rebuilding the whole file.
- A shift created without its Talent means the Talent’s email wasn’t found, or the Talent would go over an overtime limit.